Writer:www.firemixer.com Time:2021-08-02 10:02 Browse:℃
200 liters electric heating jacketed kettle operation instructions
1. Connecting to electricity and adding heat transfer oil:
(1) The electric heating jacketed kettle is located at 45° at the right rear of the outer bladder arc, R3/4”×90 outer thread head and 3/4 threaded ball valve each for exhaust. The exhaust device is at the highest end of the jacket This is beneficial to the discharge of gas during the heating process of the heat transfer oil, so as to prevent the heat transfer oil from splashing out during the heating process.
(2) When the 200L jacketed kettle pot is filled with 38kg of thermal oil (the quantity is for reference only), first lay the pot flat, fix the pot body with the locking device, and then connect the exhaust ball valve with the oil inlet device and open it. The oil measuring hole is used for exhaust. Pay attention to the oil measuring hole, and put the pot flat until the heat transfer oil overflows from this hole. This hole is also the usual heat conducting oil observation hole. Please fill it when the heat transfer oil is less than this limit.
(3) When the heat-conducting oil starts to heat up, remove the oil inlet device and open the exhaust ball valve. After heating, close the exhaust ball valve and shake the handle to turn the pot and pour the material. Use the oil inlet oiler device as an accessory. When refueling, connect the refueling device and the exhaust ball valve for use, and remove it after refueling.
(4) After the pot, PT100 is used to measure the temperature of the heat transfer oil, and the set temperature is detected by the electric control box. When the set temperature is exceeded, it will not continue to heat, on the contrary, when it is lower than the set temperature, it will continue heating.
(5) At the bottom of the oil drain device, install a 3/4 ball valve (high temperature resistant to 300℃). This ball valve can be opened when the oil needs to be drained, which can make the oil drain more convenient.
2. Clean the pot and put in the materials. You should inject heat-conducting oil first, turn on the power, and turn off the power when the materials reach the required temperature and the predetermined heating time. The hand wheel can be turned to tilt the pot body for unloading. The electric heating stainless steel jacketed kettle is now completed once.
3. Check the capacity of the heat transfer oil every time you perform an operation to avoid dry burning and damage to the equipment.
Whatsapp/Wechat: +8615621793520
Phone: +8615621793520
qq: 3206879011
Email: Raymond@loneze.com
Add: No.215, Zhanqian Street, Zhucheng City, Weifang City, Shandong Province, China